Hawker 900XP - 2010

 Airframe Total Time

3,860.6 hrs

 Airframe Total Landings:

1,466

Engines & APU Enrolled on MSP Gold
Airtext Talk, Text, & Email System
2018 Exterior
Part 135 Compliant


MAINTENANCE STATUS

B Inspection (800 hr) - c/w 3,405 hrs
C Inspection (1600 hr) c/w 2,965.3 hrs
D Inspection (3200 hr) c/w 2,965.3 hrs
E Inspection (12 mo) - c/w June, 2023
F Inspection (24 mo) - c/w June, 2022
G Inspection (48 mo) - c/w June, 2022
Landing Gear OH (12 yr) - c/w June, 2022


LEFT ENGINE

Type: TFE731-50R-1H TSN: 3,847.5 hrs CSN: 1,452

 


RIGHT ENGINE

Type: TFE731-50R-1H TSN: 3,847.5 hrs CSN: 1,452
Engines Enrolled on MSP Gold


AUXILIARY POWER UNIT (APU)
Type: GTCP36-150(W) TSN: 3,716 hrs
APU Enrolled on MSP Gold